Skip to content

Fix xml file when run-ci is aborted#14404

Open
petr-balogh wants to merge 1 commit intored-hat-storage:masterfrom
petr-balogh:fix-xunit-file-when-aborted
Open

Fix xml file when run-ci is aborted#14404
petr-balogh wants to merge 1 commit intored-hat-storage:masterfrom
petr-balogh:fix-xunit-file-when-aborted

Conversation

@petr-balogh
Copy link
Member

No description provided.

@petr-balogh petr-balogh requested a review from a team as a code owner February 13, 2026 10:04
@pull-request-size pull-request-size bot added the size/L PR that changes 100-499 lines label Feb 13, 2026
dahorak
dahorak previously approved these changes Feb 13, 2026
Signed-off-by: Petr Balogh <pbalogh@redhat.com>
@openshift-ci openshift-ci bot added the lgtm label Feb 13, 2026
@openshift-ci
Copy link

openshift-ci bot commented Feb 13, 2026

[APPROVALNOTIFIER] This PR is NOT APPROVED

This pull-request has been approved by: dahorak, petr-balogh

The full list of commands accepted by this bot can be found here.

Details Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

Copy link

@ocs-ci ocs-ci left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

PR validation on existing cluster

Cluster Name: jnk-pr14375b9733
Cluster Configuration:
PR Test Suite: acceptance
PR Test Path: tests/
Additional Test Params:
OCP VERSION: 4.21
OCS VERSION: 4.21
tested against branch: master

Job PASSED.

@petr-balogh
Copy link
Member Author

Trying to re-upload xml file to RP to see it's fine:
https://url.corp.redhat.com/dc549aa

@petr-balogh
Copy link
Member Author

Verified, it worked well

@petr-balogh petr-balogh added the Verified Mark when PR was verified and log provided label Feb 13, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

lgtm size/L PR that changes 100-499 lines Verified Mark when PR was verified and log provided

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants

Comments