Skip to content

DPTP-4733: Bump up memory limits for ArgoCD#76507

Merged
openshift-merge-bot[bot] merged 1 commit intoopenshift:mainfrom
liangxia:argo-resources
Mar 19, 2026
Merged

DPTP-4733: Bump up memory limits for ArgoCD#76507
openshift-merge-bot[bot] merged 1 commit intoopenshift:mainfrom
liangxia:argo-resources

Conversation

@liangxia
Copy link
Member

It seems 16GiB is not enough for app.ci in ArgoCD.
image

@openshift-ci-robot openshift-ci-robot added the jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. label Mar 19, 2026
@openshift-ci-robot
Copy link
Contributor

openshift-ci-robot commented Mar 19, 2026

@liangxia: This pull request references DPTP-4733 which is a valid jira issue.

Details

In response to this:

It seems 16GiB is not enough for app.ci in ArgoCD.
image

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the openshift-eng/jira-lifecycle-plugin repository.

@openshift-ci openshift-ci bot requested review from deepsm007 and psalajova March 19, 2026 04:14
@openshift-ci openshift-ci bot added the approved Indicates a PR has been approved by an approver from all required OWNERS files. label Mar 19, 2026
@liangxia
Copy link
Member Author

/cc @openshift/test-platform

@openshift-ci openshift-ci bot requested a review from a team March 19, 2026 04:15
@openshift-ci-robot openshift-ci-robot added the rehearsals-ack Signifies that rehearsal jobs have been acknowledged label Mar 19, 2026
@pruan-rht
Copy link
Member

/lgtm
/approve

@openshift-ci openshift-ci bot added the lgtm Indicates that a PR is ready to be merged. label Mar 19, 2026
@openshift-ci openshift-ci bot removed the lgtm Indicates that a PR is ready to be merged. label Mar 19, 2026
@openshift-ci-robot
Copy link
Contributor

[REHEARSALNOTIFIER]
@liangxia: no rehearsable tests are affected by this change

Note: If this PR includes changes to step registry files (ci-operator/step-registry/) and you expected jobs to be found, try rebasing your PR onto the base branch. This helps pj-rehearse accurately detect changes when the base branch has moved forward.

Interacting with pj-rehearse

Comment: /pj-rehearse to run up to 5 rehearsals
Comment: /pj-rehearse skip to opt-out of rehearsals
Comment: /pj-rehearse {test-name}, with each test separated by a space, to run one or more specific rehearsals
Comment: /pj-rehearse more to run up to 10 rehearsals
Comment: /pj-rehearse max to run up to 25 rehearsals
Comment: /pj-rehearse auto-ack to run up to 5 rehearsals, and add the rehearsals-ack label on success
Comment: /pj-rehearse list to get an up-to-date list of affected jobs
Comment: /pj-rehearse abort to abort all active rehearsals
Comment: /pj-rehearse network-access-allowed to allow rehearsals of tests that have the restrict_network_access field set to false. This must be executed by an openshift org member who is not the PR author

Once you are satisfied with the results of the rehearsals, comment: /pj-rehearse ack to unblock merge. When the rehearsals-ack label is present on your PR, merge will no longer be blocked by rehearsals.
If you would like the rehearsals-ack label removed, comment: /pj-rehearse reject to re-block merging.

@pruan-rht
Copy link
Member

/lgtm
/approve

@openshift-ci openshift-ci bot added the lgtm Indicates that a PR is ready to be merged. label Mar 19, 2026
@openshift-ci
Copy link
Contributor

openshift-ci bot commented Mar 19, 2026

[APPROVALNOTIFIER] This PR is APPROVED

This pull-request has been approved by: liangxia, pruan-rht

The full list of commands accepted by this bot can be found here.

The pull request process is described here

Details Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@liangxia
Copy link
Member Author

The failure in job app-ci-config-dry is being fixed in #76508

@liangxia
Copy link
Member Author

/override ci/build-farm/app-ci-config-dry

@openshift-ci
Copy link
Contributor

openshift-ci bot commented Mar 19, 2026

@liangxia: Overrode contexts on behalf of liangxia: ci/build-farm/app-ci-config-dry

Details

In response to this:

/override ci/build-farm/app-ci-config-dry

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the kubernetes-sigs/prow repository.

@openshift-ci
Copy link
Contributor

openshift-ci bot commented Mar 19, 2026

@liangxia: all tests passed!

Full PR test history. Your PR dashboard.

Details

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the kubernetes-sigs/prow repository. I understand the commands that are listed here.

@openshift-merge-bot openshift-merge-bot bot merged commit 6722187 into openshift:main Mar 19, 2026
22 checks passed
@liangxia liangxia deleted the argo-resources branch March 19, 2026 06:20
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lgtm Indicates that a PR is ready to be merged. rehearsals-ack Signifies that rehearsal jobs have been acknowledged

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants