Modular planning tools to support process scale-up, tech transfer readiness, and cross-functional enablement in production manufacturing environments.
This starter kit supports engineering, MSAT, and systems integration teams in managing upstream-to-production readiness. It focuses on documentation maturity, handoff alignment, and cross-functional coordination during process transfers, new tool installs, or scale-up initiatives.
It is designed for environments where quality, speed, and team interoperability must be balanced — including GMP, ISO 9001, or multi-site operations.
Common challenges this kit addresses:
- Vague or shifting definitions of “ready for scale-up”
- Misalignment between development and manufacturing expectations
- Cross-site transfer ambiguity and tool mismatches
- Fragmented system readiness across QA, automation, and production
- Risk of overloading teams with non-adoptable documentation or disconnected assets
- Lack of structured tools for system-level root cause analysis and shared learning
- Troubleshooting breakdowns in integrated platforms where equipment, material, and process variables interact
Each folder contains implementation-ready tools, templates, or trackers mapped to a specific initiative:
cross_site_transfer_checklist.xlsx— verifies cross-site process alignmenthandoff_criteria_template.docx— defines gate conditions for engineering-to-ops transferprocess_change_checklist.xlsx— logs and stages change requestsprocess_change_whitepaper_template.docx— documents rationale and outcomes of major changestraining_material_repository_template.xlsx— organizes SOP and training asset readinesspareto_tracker_template.xlsx— categorizes and visualizes problem contributorsseq_validation_template.xlsx— validates tool variability over time using SEQ methodologypostmortem_summary_template.docx— documents root cause findings, CAPA actions, and lessons learned
process_readiness_tracker.xlsx— tracks transfer readiness across ownership lanesprocess_maturity_scorecard.xlsx— evaluates documentation and process maturity against predefined criteriaengineering_ownership_matrix.xlsx— clarifies responsibilities across functionstraining_completion_matrix.xlsx— logs and verifies staff training statuscross_site_change_tracker.xlsx— synchronizes ongoing change propagationbasic_bom_tracker_template.xlsx— ensures BOM component traceabilitygantt_timeline_tracker.xlsx— visualizes handoff and validation timelinestool_readiness_tracker.xlsx— flags install and calibration completion statefmea_ci_tracker.xlsx— captures known risks and ongoing mitigationsownership_vs_risk_matrix.xlsx— aligns owners to high-risk failure modesscale_up_risk_score_tracker.xlsx— quantifies readiness and risk by categorysystem_issue_investigation_tracker.xlsx— logs root cause models, supporting data, and planned experiments
material_cost_calculator.xlsx— maps material usage to cost per unitavailability_calculator.xlsx— estimates tool availability based on PM schedule
tool_install_workflow_guide.docx— walkthrough of IQ/OQ/PQ stages and owner logictransfer_readiness_mapping.md— maps all assets to their usecase and readiness initiativedata_analysis_methods.md— outlines data analysis strategies to troubleshoot ambiguous system issues
This kit is designed to be modular and adaptive — teams can adopt tools individually or deploy them as a full coordination system. All files are editable and built for practical use in production or regulated environments.
Recommended entry points:
- New process introduction → start with
process_readiness_tracker.xlsx - Cross-site transfer → begin with
cross_site_transfer_checklist.xlsx - Tool installation → follow
tool_install_workflow_guide.docx - Validation consistency → use
seq_validation_template.xlsx - Engineering-to-ops handoff → apply
handoff_criteria_template.docx - Risk-driven CI → implement
fmea_ci_tracker.xlsxandpareto_tracker_template.xlsx - Integrated issue investigation → use
system_issue_investigation_tracker.xlsx
All Excel-based tools include:
- Pre-filled examples
- Change logs
- Conditional formatting (where applicable)
Where initiatives span multiple functions, refer to transfer_readiness_mapping.md for coordinated adoption pathways.
For scoping ambiguous failures, refer to data_analysis_methods.md in /reference/ to guide early data-driven troubleshooting steps.
This kit intentionally balances thoroughness with usability. Assets are designed to reduce ambiguity, not increase documentation overhead. Teams may selectively adopt trackers that streamline execution. For broader rollout, assets can be aligned to existing review structures, or used as scaffolds for iterative feedback.
This kit is not a regulatory protocol library, execution system, or formal audit substitute. It complements — but does not replace — internal SOPs, MES, LIMS, or QMS tools. It is designed to support clarity, traceability, and systems coordination across readiness-driven initiatives.
This kit is designed for:
- MSAT and process engineers preparing upstream process transfers
- Staff-level engineers managing readiness across tools, automation, QA
- Cross-functional leads coordinating change, install, and production prep
- Systems integration engineers investigating ambiguous platform issues and coordinating root cause resolution across hardware, software, and process teams
This kit is not intended for:
- Certifying bodies or auditors (without customization)
- Scientists creating product-specific protocols
- Automation-only teams building end-to-end system logic
This project is licensed under the MIT License. See LICENSE for more details.