Skip to content

Drop use of E_STRICT #520

Drop use of E_STRICT

Drop use of E_STRICT #520

Triggered via pull request November 26, 2025 21:45
Status Failure
Total duration 1m 45s
Artifacts

continuous-integration.yml

on: pull_request
Matrix: Symfony1 Tests
Fit to window
Zoom out
Zoom in

Annotations

8 errors
Symfony1 Tests (8.3, 1.6)
The strategy configuration was canceled because "tests._8_1_1_6" failed
Symfony1 Tests (8.1, 1.6)
Process completed with exit code 1.
Symfony1 Tests (8.4, 1.6)
The strategy configuration was canceled because "tests._8_1_1_6" failed
Symfony1 Tests (8.4, 1.6)
The operation was canceled.
Symfony1 Tests (7.4, 1.6)
The strategy configuration was canceled because "tests._8_1_1_6" failed
Symfony1 Tests (7.4, 1.6)
The operation was canceled.
Symfony1 Tests (8.2, 1.6)
The strategy configuration was canceled because "tests._8_1_1_6" failed
Symfony1 Tests (8.2, 1.6)
The operation was canceled.