Skip to content

Commit 926541d

Browse files
authored
Merge pull request #70 from talentprotocol/tolgadizmen-patch-1
Update FAQ link in stacks-builder-challenges.mdx
2 parents 1067ce8 + b3d2c72 commit 926541d

File tree

1 file changed

+2
-2
lines changed

1 file changed

+2
-2
lines changed

docs/legal/stacks-builder-challenges.mdx

Lines changed: 2 additions & 2 deletions
Original file line numberDiff line numberDiff line change
@@ -43,7 +43,7 @@ The Program consists of three (3) distinct challenges.
4343
- Allocated Reward Pool: 12,000 $STX.
4444
- Distribution Date: Rewards will be distributed on December 31, 2025.
4545

46-
The specific details, rules, and evaluation criteria for each challenge are available on the Stacks Builder Challenges FAQ page.
46+
The specific details, rules, and evaluation criteria for each challenge are available on the [Stacks Builder Challenges FAQ](https://talentprotocol.notion.site/Stacks-FAQ-2c0fc9bb531980b1b7d0d8178771fcbb).
4747

4848
## 4. Reward Structure
4949

@@ -55,7 +55,7 @@ Tier 3: Next 25 builders share 25% of the reward pool, proportionally to their a
5555

5656
## 5. Evaluation Criteria
5757

58-
The specific details, rules, and evaluation criteria for each challenge are available on the Stacks Builder Challenges FAQ page.
58+
The specific details, rules, and evaluation criteria for each challenge are available on the [Stacks Builder Challenges FAQ](https://talentprotocol.notion.site/Stacks-FAQ-2c0fc9bb531980b1b7d0d8178771fcbb).
5959

6060
The specific weights and formulas used to calculate rankings are proprietary and subject to change at the sole discretion of Talent Protocol.
6161

0 commit comments

Comments
 (0)