prepare release of v1.3.1 (#33) #169
test.yml
on: push
quality
34s
analysis
39s
Matrix: integration
Annotations
3 errors
|
integration (8.2, 6.4)
Process completed with exit code 28.
|
|
integration (8.3, 6.6)
The operation was canceled.
|
|
integration (8.3, 6.6)
The strategy configuration was canceled because "integration._8_2_6_4" failed
|