Skip to content

chore(deps): update dependency c8 to v10 #402

chore(deps): update dependency c8 to v10

chore(deps): update dependency c8 to v10 #402

Triggered via pull request September 25, 2025 20:44
Status Failure
Total duration 23s
Artifacts

ci.yaml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

8 errors
test (10)
Process completed with exit code 1.
test (16)
The strategy configuration was canceled because "test._10" failed
test (20)
The operation was canceled.
test (20)
The strategy configuration was canceled because "test._10" failed
test (12)
The operation was canceled.
test (12)
The strategy configuration was canceled because "test._10" failed
test (14)
The operation was canceled.
test (14)
The strategy configuration was canceled because "test._10" failed