Skip to content

chore(deps): update dependency c8 to v10 #401

chore(deps): update dependency c8 to v10

chore(deps): update dependency c8 to v10 #401

Triggered via pull request August 19, 2025 17:12
Status Failure
Total duration 26s
Artifacts

ci.yaml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

11 errors
test (10)
Process completed with exit code 1.
test (12)
The operation was canceled.
test (12)
The strategy configuration was canceled because "test._10" failed
test (20)
The operation was canceled.
test (20)
The strategy configuration was canceled because "test._10" failed
test (16)
The operation was canceled.
test (16)
The strategy configuration was canceled because "test._10" failed
test (18)
The operation was canceled.
test (18)
The strategy configuration was canceled because "test._10" failed
test (14)
The operation was canceled.
test (14)
The strategy configuration was canceled because "test._10" failed