Skip to content

test fix

test fix #731

Triggered via push January 25, 2026 09:24
Status Cancelled
Total duration 15m 18s
Artifacts

e2e.yml

on: push
Matrix: Lint, Build and test
Fit to window
Zoom out
Zoom in

Annotations

4 errors and 2 notices
Lint, Build and test (24.x)
The job has exceeded the maximum execution time of 15m0s
Lint, Build and test (24.x)
The operation was canceled.
Lint, Build and test (22.x)
The job has exceeded the maximum execution time of 15m0s
Lint, Build and test (22.x)
The operation was canceled.
🎭 Playwright Run Summary
1 passed (4.5s)
🎭 Playwright Run Summary
1 passed (5.5s)