Simulate aggressive imports that exceed site constraint #53

@mw2b

Description

@mw2b

If we haven’t imported energy in the first half of the SP, then we could exceed the power constraint in the second half, as long as the total energy in the half-hour does not exceed the (constraint * 0.5hours) kWh. This is because the constraint is monitored and billed as the energy within a half-hour.

This might improve our performance as we have a small import constraint at some sites, and only get the imbalance price signal late into the SP. But we'd need to make sure this is allowed.