Skip to content

Support simulations without any BESS #52

@mw2b

Description

@mw2b

Currently to simulate a microgrid without a BESS you need to set the bess size to very small (like 0.1kWh), but then the simulation still does all the number crunching as if there was a battery.

The simulator should be updated so that we can specify that the bess doesn't exist - this could be configured by either setting the bess size to 0kWh, or by leaving out the bess configuration completely.

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions