Skip to content

Started to restructure. #14

Started to restructure.

Started to restructure. #14

Triggered via push February 4, 2025 04:02
Status Failure
Total duration 45s
Artifacts
Matrix: call-pre-build / tests
Fit to window
Zoom out
Zoom in

Annotations

13 errors
call-pre-build / tests (ubuntu-24.04): interconnection/server/unix/dbus/dbus.go#L5
no required module provides package github.com/AmadlaOrg/LibraryUtils/encryption; to add it:
call-pre-build / tests (ubuntu-24.04)
Process completed with exit code 2.
call-pre-build / tests (windows-2022)
The job was canceled because "ubuntu-24_04" failed.
call-pre-build / tests (windows-2022)
The operation was canceled.
call-pre-build / tests (macos-14)
The job was canceled because "ubuntu-24_04" failed.
call-pre-build / tests (windows-2019)
The job was canceled because "ubuntu-24_04" failed.
call-pre-build / tests (windows-2019)
The operation was canceled.
call-pre-build / tests (windows-2025)
The job was canceled because "ubuntu-24_04" failed.
call-pre-build / tests (windows-2025)
The operation was canceled.
call-pre-build / tests (macos-13)
The job was canceled because "ubuntu-24_04" failed.
call-pre-build / tests (macos-13)
The operation was canceled.
call-pre-build / tests (ubuntu-22.04)
The job was canceled because "ubuntu-24_04" failed.
call-pre-build / tests (macos-15)
The job was canceled because "ubuntu-24_04" failed.