Skip to content

update

update #9

Triggered via push December 11, 2025 15:40
Status Failure
Total duration 34s
Artifacts

test.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

20 errors
test (ubuntu-latest, 3.12)
Process completed with exit code 100.
lint
Process completed with exit code 1.
lint
Process completed with exit code 1.
lint
Process completed with exit code 1.
test (ubuntu-latest, 3.10)
The strategy configuration was canceled because "test.ubuntu-latest_3_12" failed
test (ubuntu-latest, 3.10)
Process completed with exit code 100.
test (ubuntu-latest, 3.11)
The strategy configuration was canceled because "test.ubuntu-latest_3_12" failed
test (ubuntu-latest, 3.11)
The operation was canceled.
test (windows-latest, 3.12)
The strategy configuration was canceled because "test.ubuntu-latest_3_12" failed
test (windows-latest, 3.12)
The operation was canceled.
test (macos-latest, 3.10)
The strategy configuration was canceled because "test.ubuntu-latest_3_12" failed
test (macos-latest, 3.10)
The operation was canceled.
test (windows-latest, 3.11)
The strategy configuration was canceled because "test.ubuntu-latest_3_12" failed
test (windows-latest, 3.11)
The operation was canceled.
test (windows-latest, 3.10)
The strategy configuration was canceled because "test.ubuntu-latest_3_12" failed
test (windows-latest, 3.10)
The operation was canceled.
test (macos-latest, 3.11)
The strategy configuration was canceled because "test.ubuntu-latest_3_12" failed
test (macos-latest, 3.11)
The operation was canceled.
test (macos-latest, 3.12)
The strategy configuration was canceled because "test.ubuntu-latest_3_12" failed
test (macos-latest, 3.12)
The operation was canceled.